Wuhu Jiahong New Material Co., Ltd.

Heating Cable, Pipe Freeze Protection, Electric Heating Cables manufacturer / supplier in China, offering Pre-Assembled Electric Heating Cables for Pipe Freeze Protection, Skin-Effect Cable Industrial Pipe Heating Wrap Freeze Protection Heat Cable, 230V Low Energy Cost Constant Wattage Parallel Circuit Heating Cable and so on.

Supplier Homepage Product List self-regulating heating cable Pre-Assembled Electric Heating Cables for Pipe Freeze Protection

Pre-Assembled Electric Heating Cables for Pipe Freeze Protection

FOB Price:US $10 - 50 / Piece
Min. Order (Pieces) FOB Price
100+ US $10-50 / Piece
Get Latest Price
Min. Order: 100 Pieces
Port: Shanghai, China
Production Capacity: 17000PCS Per Day
Payment Terms: L/C, T/T, D/P, Paypal

Request a custom order and have something just for you!

Send Customized Request

Basic Info.

Model NO.:HTM-KIT
Rated Voltage:208-277 VAC
Output:3 W/FT @ 10ºC
Heating Element Size:1-100m
Bending Radius:12mm
Bus Wire Gauge:0.56mm^2
Min. Installation Temp:-40ºC
Mechanical Classification:M2
Heating Lead:3htm Self-Regulating Heating Cable
Cold Lead:2 M Length 3G1.0 with Plug
Trademark:jiahong
Transport Package:White Box
Origin:Anhui Wuhu

Product Description

Pre-assembled electric heating cables for pipe freeze protection
Product Description
1.Product pictures of  
Pre-assembled electric heating cables for pipe freeze protection
Pre-Assembled Electric Heating Cables for Pipe Freeze Protection

2.General imformation of Pre-assembled electric heating cables for pipe freeze protection
GENERAL
3HTM2-CT KIT Pre-assembled electric heating cable are intended for installation on metal or plastic water pipe for freeze protection in commercial locations. The 3HTM2-CT KIT consists of a heating cables and 2m long rubber connection cable with an attachment plug. The self-regulating cable provides peak heat during cold periods and reduced heat when the air temperature rises.

Ordering Information 
Catalog NumberVoltage                 Cable Length/m                    Watts              
3HTM2-CT KIT-1m230110
3HTM2-CT KIT-2m230220
3HTM2-CT KIT-3m230330
3HTM2-CT KIT-4m230440
3HTM2-CT KIT-5m230550
3HTM2-CT KIT-6m230660
3HTM2-CT KIT-7m230770
3HTM2-CT KIT-8m230880
3HTM2-CT KIT-10m23010100
3HTM2-CT KIT-13m23013130
3HTM2-CT KIT-15m23015150
3HTM2-CT KIT-19m23019190
3HTM2-CT KIT-20m23020200
3HTM2-CT KIT-25m23025250
3HTM2-CT KIT-30m23030300
3HTM2-CT KIT-40m23040400
3HTM2-CT KIT-50m23050500
3HTM2-CT KIT-60m23060600
3HTM2-CT KIT-70m23070700
3HTM2-CT KIT-80m23080800
3HTM2-CT KIT-90m23090900
3HTM2-CT KIT-100m2301001000
 

Company Information
1.About Us

WuHu Jiahong New Material Co. Ltd is the largest heating cable manufacturer in Asia-pacific. We are always dedicated to research, develop and produce both constant wattage and self-regulating heating cables since 1993. Till now, Jiahong has obtained more than 30 national patents. We are one of the few members of China self-regulating heating cable national standard GB/T 19835-2005.


Most of WuHu Jiahong products passed UL, CSA, ETL, TUV, CE, ATEX etc. We export to many regions, especially North America, Europe, Australia and Asia. High quality combines with professional services earned us a good reputation.
Pre-Assembled Electric Heating Cables for Pipe Freeze Protection
2. Why Choose us

Advantages

Pre-Assembled Electric Heating Cables for Pipe Freeze Protection

Our Services

We help our customer develop heating cable, floor heating, snow melting for their application and OEM offered.
Quality control
Pre-Assembled Electric Heating Cables for Pipe Freeze Protection
3. Company Certificates
Pre-Assembled Electric Heating Cables for Pipe Freeze Protection

 

FAQ

 1.How long will it take for the underfloor heating system to warm up?

The warm up time of an electric underfloor heating system will be dictated by the insulation used beneath it and the output of the system. In general, the better insulated the sub-floor the faster the system will warm up, with Underfloor Insulation boards?facilitating a very speedy warm up time of as little as 15 minutes, and un-insulated concrete floors causing the slowest warm up time. Using a?200W system?beneath ceramic/stone tiles provides a faster warm up time than 150W system.

 

2. Can I turn my heating on the day it is fitted? 

If you have installed your heating beneath tile adhesive, levelling compound or a screed you must allow this to dry out before turning on your system for the first time. If the system is turned on too early it will force the moisture out of the covering which may lead it to crack. We would recommend speaking to the manufacturer of your flexible tile adhesive, grout or screed to confirm the drying time required.

 

3. Does each room require its own thermostat?

We would recommend that each room has its own heating system controlled by its own thermostat. This will allow for simpler and more accurate temperature control of each room and will avoid heating rooms which do not require it.

Pre-Assembled Electric Heating Cables for Pipe Freeze Protection
 
Send your message to this supplier
Avatar
Ms. Yuri
*From
To Ms. Yuri
*Message
Enter between 20 to 4,000 characters.
This is not what you are looking for? Post a Sourcing Request Now
Find Similar Products By Category:

Wuhu Jiahong New Material Co., Ltd.

- Anhui, China
- Manufacturer/Factory & Trading Company

Gold Member Since 2016
Audited Supplier
  • Sample Available
  • OEM/ODM Service